Application for Confirmation of Drainage Equipment
Last Updated July 18, 2024
Outline of application for confirmation of drainage plan (exclusion)
Drainage facilities are facilities for drainage that you maintain and manage.
Looking at the ground around the building (it is easy to find if it is a newly built house for sale), there are lids such as a round shape made of concrete or vinyl chloride (in the case of rainwater only, it may be a square iron lattice lid). That is what is called "masu" of drainage equipment. In the meantime, it is basically connected by a pipe, and at the end it is connected (made of concrete) to the public sewer.
It is your duty to prepare drainage facilities, and prior to the maintenance of drainage facilities, it is necessary to obtain confirmation from The Mayor of Yokohama that the plan conforms to the provisions of laws and regulations concerning the installation and structure of drainage facilities, etc.
What is created to obtain confirmation is the “Drainage Equipment (wash toilet remodeling) plan confirmation application”.
The application will be submitted to Public Works Office in case of detached houses.
The application form has "original copy" and "duplicate copy", and after confirmation, the "duplicate copy" with the confirmed mark is returned to the applicant.
Construction of drainage facilities can only be performed by a designated drainage construction shop. (Designated construction shops display "Drainage Equipment Designated Construction Shop Certificate" in an easy-to-see place at the sales office.)
Please read the “Yokohama City Drainage Equipment Handbook” carefully and contact Public Works Office or Environmental Planning Bureau Sewer Management Division if you have any questions.
Legal basis for "Application for Confirmation of Drainage Equipment Plan (Exclusion)"
When a public notice (notification) of the start of operation is made, there is an obligation to install drainage facilities according to Article 10 of the Sewerage Law and connect to public sewage.
Next, those who intend to install drainage facilities must receive confirmation that the plan conforms to the provisions of laws and regulations on the installation and structure of drainage facilities. (Article 4 of the Sewerage Ordinance)
Application procedure for confirmation of drainage plan confirmation application (exclusion) "
Please refer to the flow chart from application to completion of examination.
(The submitted "exclusive" documents will be generally reviewed according to this procedure.)
Change procedure for confirmation of drainage plan
Person who is going to perform new construction such as drainage facilities must receive confirmation of "exclusion" by rule of regulations Article 4. If you want to change the confirmed items, please receive the same confirmation.
If you want to change the drainage area or drainage system after receiving "extraction", create a new "extraction" and fill in the remarks column with the original confirmation number and the reason for the change. Please receive confirmation again with a duplicate of "extraction".
However, other minor changes can be replaced by correcting the duplicate of "exclusiveness".
Completion procedure for confirmation of drainage plan
Upon confirmation of "exclusion", please submit a "completion notification" within 5 days from the date the construction is completed (submitted to each Public Works Office).
Inspection of drainage plan confirmation
Those who intend to establish new drainage facilities, etc., should be able to confirm in accordance with Article 4 of the Ordinance whether the plan conforms to the provisions of laws and ordinances related to the installation and structure of drainage facilities. There is no provision for inspection.
However, if the inspection is determined by law or rules, it will be performed.
Name of construction | Target person | Legal basis for inspection |
---|---|---|
Remodeling of flush toilets (Recommissioning of human waste septic tank) | Those who have received grants or loans | Fund for flush toilets in Yokohama City Grant Loan Rules Article 9 Article 22 |
Self-funded construction If you wish to have an inspection | Apply mutatis mutandis to the above rules | |
Inspection of other drainage facilities (including specified facilities and abatement facilities) | Installer or owner of drainage equipment, etc. | Article 13 of the Sewerage Law In order to preserve the functions and structures of public sewers, etc., or to make the quality of the effluent a technical standard, it is possible to inspect other people's land or buildings to the extent necessary (excerpt) |
Notes for submitting a plan confirmation application for drainage facilities, etc.
If any of the following matters apply for connection and installation pipes, consult with Public Works Office in advance before applying for confirmation of drainage plans.
- If the connection on a public road is required.
- In case of repair of existing mounting pipes or insufficient pipe diameter.
- When installing a connection on a public road.
- When connecting and installing a new mounting pipe.
attached documents of the application form for confirmation of plans for drainage facilities
The books attached to the drainage system (remodeling flush toilet) plan confirmation application (hereinafter referred to as “plan confirmation application”) submitted to the Public Works Office in each ward are as follows. In addition, about the details, please read Yokohama-shi drainage system handbook (P37) well.
(1) Based on the drainage area and the drainage population
Attachments | Scale | Category | ||
---|---|---|---|---|
Drainage population less than 1,000 | Drainage population of 1,000 or more | |||
Drainage area less than 400 square meters | Drainage area of 400 square meters or more Drainage area less than 1500 square meters | Drainage area of 1500 square meters or more | ||
A sketch of the neighborhood (guidance map) | Appropriately (general landmarks nearby (specify directions from bus stops, bridges, "Koban" (police box), schools, etc.)) | ○ | ○ | ○ |
Layout plan (floor plan) | In principle, at least 1/400 | ○ | ○ | ○ |
Longitudinal section | The side is the same as the layout drawing. Vertical length is more than 10 times horizontal | ○ | ○ | ○ |
Drainage area division floor plan | According to the layout drawing. | --- | ○ | ○ |
Calculation table for area, etc. | --- | --- | ○ | --- |
Flow rate table | --- | --- | --- | ○ |
(2) In case of installation of underground drainage tanks
(1) In addition to the classification, detailed structural drawings of the underground drainage tank (floor plan, longitudinal section)
(3) When the installation location is related to development activities, etc.
(1) In addition to the classification, a copy of the drainage area division floor plan attached at the time of consultation on development activities, etc.
Application download
Inquiries to this page
Midori Ward Green Public Works Office
Telephone: 045-981-2100
Telephone: 045-981-2100
Fax: 045-981-2112
Email address: md-doboku@city.yokohama.lg.jp
Page ID: 280-582-054