Menu

Close

Here's the text.

Introduction of Other Facilities

Last updated March 11, 2024

Power generation facilities for private power generation

Electricity may stop due to a power outage, etc., or heavy rain may cause electricity to run out of the legs.
For this reason, there is a private power generation facility (Jikayohatsuden Sesetsubi) that produces electricity (denki) at the water regeneration center.

Control panel

In-house power generation facilities (diesel engines)


         Control panel           Private power generation facilities (diesel engines)

Treatment water reuse facilities (shorisuiriyosetsubi)

The clean water (mizu) flows directly into the Tsurumi River (Tsurumigawa) and flows into the treated water reuse facility.
This equipment (setsubi) removes fine garbage, etc., and reuses it as water to clean the equipment of the center. I am doing it.

Treatment water reuse equipment



      Treatment water reuse facilities (shorisuiriyosetsubi)

Ozone processing equipment (shosetsubi)

There is a small amount of color left in the clean water (water). The equipment (setsubi) to make it more beautiful is the ozone processing equipment.
The cleaner water (mizu) here flows into the Egawa murmuring or sent to La LaLa Port Yokohama (Yokohama) for toilet water. It is used for (mizu).

Ozone processing equipment



       Ozone processing equipment (shosetsubi)

Egawa (Egawa)

The water (mizu) cleaned by the ozone treatment equipment (shorisetsubi) flows into the Egawa murmuring.
Depending on the season, we observe the state of water every day so that you can enjoy various creatures and scenery (Kesshiki). I am.

Egawa murmuring

Egawa Seseragi (Spring)


     Egawa (Egawa) murmuring (water source)           Egawa (Egawa) murmuring (spring)

Central operation room (Chuo Sosatsu)

The central operation room is a place where you can check the status of all machines and electricity at the water reclamation center. ).
In the event that a machine (kikai) breaks down, a buzzer informs the staff (shokuin) and can respond.
Monitoring (Kanshi) 24 hours a day, 365 days a year.

Central Operation Room



       Central operation room (Chuo Sosatsu)

For inquiries to this page

Sewerage River Bureau Sewerage Facilities Department Tsuzuki Wastewater Treatment Plant

Phone: 045-932-2321

Phone: 045-932-2321

Fax: 045-931-8919

Email address: gk-tsuzukiwtp@city.yokohama.lg.jp

Return to the previous page

Page ID: 644-540-169

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews