Menu

Close

Here's the text.

80.(Tentative name) Apa Hotel & Resort <Yokohama Bay Tower> Apa Hotel & Resort <Yokohama Bay Tower> Post-Survey on New Construction (Part 2)

Last Updated December 2, 2022

Post-Survey Results Report (Part 2 during construction)

(Tentative name) Apa Hotel & Resort <Yokohama Bay Tower> Please see the following PDF file for the post-construction survey report (part 2 during construction).
In addition, texts, photographs, figures, etc. in PDF files are subject to copyright.
Unless permitted by copyright law, such as "reproduction for personal use" or "quotation", copying or diverting without permission is prohibited.
In addition, PDF files cannot be printed due to the circumstances of the business.

Main part

Chapter 1 Plan Contents of Target Projects

  • 1.1 Name and Location of Business Operators
  • 1.2 Name of target business
  • 1.3 Type and Scale of Target Business
  • 1.4 Target project implementation area
  • 1.5 Outline of the Target Business
  • 1.5.1 Scale of target business, etc.
  • 1.5.2 Facility layout
  • 1.6 Construction plan
  • 1.7 Matters to be considered during construction
  • 1.8 Progress of implementation of target projects
  • Chapter 2 Matters Concerning Implementation of Post-Survey
    • 2.1  Ex-post survey items and methods described in the evaluation report
    • 2.2  Post-Survey Schedule
    • 2.3 Details of the ex-post investigation
  • Chapter 3 Results of Ex-post Investigation
    • 3.1 Waste and Construction Soil
    • 3.2 Implementation of environmental conservation measures with consideration during construction y
  • Chapter 4 Others
    • 4.1 Trustee of post-survey
  • Materials  

   Waste 
    1 Calculation results of business-related general waste
    2 Results of Industrial Waste       

Remarks


Yokohama City Topographic Map Duplication Approval Number Taira 31 Construction Capital Total No. 9007

Procedure Status

Please refer to “80. (Tentative name) Apa Hotel & Resort <Yokohama Bay Tower> New Construction Environmental Impact Assessment Procedure for New Construction” for the status of procedures for this project.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Environmental Conservation Department, Green Environment Bureau Environmental Conservation Department

Phone: 045-671-2495

Phone: 045-671-2495

Fax: 045-663-7831

Email address: mk-eikyohyoka@city.yokohama.lg.jp

Return to the previous page

Page ID: 803-678-691

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews