- Yokohama-shi Top Page
- Living and Procedures
- Community Development and Environment
- Environmental Conservation
- Environmental Conservation Initiatives
- Environmental assessment
- Business in Yokohama City
- 100.(Tentative name) Kannai Ekimae Minatomachi District Type 1 Urban Redevelopment Project Environmental Impact Assessment Procedure
- 100.(Tentative name) Kannai Ekimae Minatomachi District Type 1 Urban Redevelopment Project Environmental Impact Assessment Report
Here's the text.
100.(Tentative name) Kannai Ekimae Minatomachi District Type 1 Urban Redevelopment Project Environmental Impact Assessment Report
Last Updated November 15, 2024
Environmental Impact Assessment Report
(Tentative name) Please see the following PDF files for the Kannai Ekimae Port Town District Type 1 Urban Redevelopment Project Environmental Impact Assessment Report.
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
Environmental Impact Assessment Report
Main part
Environmental Impact Assessment Evaluation Report (Main) [Batch Version] (PDF: 18,842KB)
- Cover, First, Table of Contents (PDF: 1,650KB)
- Matters (PDF: 12,558KB) that comprehensively examined Chapter 1 examination documents and changed the contents of the preparation documents (PDF: 12,558KB)
- Chapter 2 Plans for Target Businesses
- 2.1 Outline of the target business
- 2.2 Purpose and necessity of the target project
- 2.3 Contents of the target business
- 2.3.1 Location and area of the target project implementation area
- 2.3.2 Facility layout plan
- 2.3.3 Transportation Planning
- 2.3.4 Parking plan
- 2.3.5 Motorcycle and bicycle parking plan
- 2.3.6 Pedestrian Traffic Line Plan
- 2.3.7 Heat source planning
- 2.3.8 Water supply and drainage and supply facilities plan
- 2.3.9 Exhaust and ventilation plan
- 2.3.10 Waste treatment plan
- 2.3.11 disaster preparedness plan
- 2.4 Global Warming Countermeasures
- 2.5 conservation of Biodiversity
- 2.6 Green conservation and Creation
- 2.7 Construction plan
- 2.8 History of the Plan
- 2.8.1 Process of Development Plan
- 2.8.2 Business Schedule
- Chapter 3 Regional Overview and Regional Characteristics (PDF: 9,870KB)
- 3.1 Setting of surveyed areas, etc.
- 3.2 Regional overview
- 3.2.1 Weather conditions
- 3.2.2 Topography, geology, and ground conditions
- 3.2.3 Water Cycle
- 3.2.4 Conditions of plants and animals
- 3.2.5 Population and Industry Situation
- 3.2.6 Status of Land Use
- 3.2.7 Transportation and Transportation
- 3.2.8 Status of public facilities (PDF: 9,326KB)
- 3.2.9 Status of Cultural Properties, etc.
- 3.2.10 Pollution, etc.
- 3.2.11 Status of Disasters (PDF: 10,162KB)
- 3.2.12 Status of Waste
- 3.2.13 Status of laws and regulations
- 3.3 Regional characteristics of surveyed areas, etc.
- Chapter 4 Contents of consideration based on consideration guidelines (PDF: 731KB)
- 4.1 Contents of consideration that we examined environmental information offer book and consideration mayor opinion generally and changed
- Chapter 5 Extracting Environmental Impact Factors and Selection of Environmental Impact Assessment Items (PDF: 1,017KB)
- 5.1 Extraction of environmental impact factors
- 5.2 Selection of environmental impact assessment items
- Chapter 6 Forecast and Evaluation of Environmental Impact Assessment (PDF: 1,224KB)
- 6.1 Greenhouse gas
- 6.2 Biodiversity (animals) (PDF: 3,718KB)
- 6.3 Waste and construction soil (PDF: 2,265KB)
- 6.4 Air quality (PDF: 15,342KB)
- 6.5 Noise (PDF: 8,962KB)
- 6.6 Vibration (PDF: 3,506KB)
- 6.7 Ground (PDF: 5,819KB)
- 6.8 Radio interference (PDF: 5,807KB)
- 6.9 Shadow (inhibition of sunshine) (PDF: 10,240KB)
- 6.10 Wind damage (PDF: 11,936KB)
- 6.11 Safety (Inundation) (PDF: 1,330KB)
- 6.12 Local communities (traffic congestion, pedestrian safety) (PDF: 20,209KB)
- 6.13 Landscape (PDF: 16,184KB)
- Chapter 7 Comprehensive Evaluation of Environmental Impacts (PDF: 683KB)
- Chapter 8 Matters concerning the implementation of post-survey (PDF: 1,016KB)
- 8.1 Concept of post-survey
- 8.2 Selection of post-survey items
- 8.3 Details of post-survey items
- Chapter 9 Target Areas (PDF: 1,890KB)
- Opinions, opinions, etc. on Chapter 10 Preparation Document (PDF: 10,199KB)
- 10.1 Preparation briefing session holding situation, question and answer, summary of opinion and explanation of company
- 10.2 Contents of statement of position for preparation and opinion of business operator
- 10.3 Opinion of the mayor listed in examination book and opinion of company
- 10.4 Materials submitted to the Examination Committee
- Article 11 method Matters (PDF: 767KB) that examined the mayor's statements comprehensively and changed the contents of the method book
- Opinions, opinions, etc. on Chapter 12 Method Statement (PDF: 1,126KB)
- 10.1 Method book briefing session holding situation, question and answer, summary of opinion and opinion of company
- 10.2 Contents of statement of position for method book and opinion of company
- 10.3 Method Opinion of the mayor listed in the mayor statement of position and opinion of company
Materials
About environmental impact assessment book (document), "100. (tentative name) Kannai Ekimae Minatomachi district first-class urban area redevelopment project environmental impact assessment report (document) (1/2)" and "100. (Tentative name) Kannai Ekimae Minatomachi District Type 1 Urban Redevelopment Project Environmental Impact Assessment Report (Document) (2/2) ".
- Chapter 1 Business Plan Related
- 1.1 High-level plan related
- 1.2 Business Plan
- 1.2.1 Target project implementation area
- 1.2.2 Transportation Planning
- 1.3 Inland water inundation assumption area map
- Chapter 2 Regional Overview
- 2.1 Park green space layout map
- Chapter 3 Forecast and Evaluation
- 3.1 Biodiversity (animals)
- 3.1.1 Survey of Existing Materials
- 3.1.2 Field survey
- 3.2 Air quality
- 3.2.1 Field survey
- 3.2.2 Prediction
- 3.3 Noise
- 3.3.1 Field survey
- 3.3.2 Prediction
- 3.4 Vibration
- 3.4.1 Field survey
- 3.4.2 Prediction
- 3.5 Ground
- 3.5.1 Survey of Existing Materials
- 3.6 Radio interference
- 3.6.1 Field survey
- 3.7 Wind damage
- 3.7.1 Prediction conditions
- 3.7.2 Forecast results
- 3.8 Local communities (traffic congestion and pedestrian safety)
- 3.8.1 Field survey
- 3.8.2 Traffic volume during construction and future traffic volume by inflow lane at intersection
- 3.8.3 Intersection demand rate
- 3.8.4 Percentage of pedestrians
- 3.1 Biodiversity (animals)
- 3.9 Landscape
- 3.9.1 Field survey
- 3.9.2 Prediction
- 3.9.3 (Tentative name) Kannai Ekimae Minatomachi District Type 1 Urban Redevelopment Project Town Development and Landscape Formation Examination Materials
Remarks
- About map issued by Geographical Survey Institute used in PDF file
- Created by processing electronic topographic map 25000 (GSI)
- Yokohama City Topographic Map Reproduction Approval Number Ordinance 6 Building No. 9104
- If a third party duplicates further, it must obtain the approval of the head of the Geographical Survey Institute.
Status of Procedures
Please refer to “100. (tentative name) Kannai Ekimae Minatomachi District Type 1 Urban Redevelopment Project Environmental Impact Assessment Procedure” for the status of this project.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau
Telephone: 045-671-2495
Telephone: 045-671-2495
Fax: 045-663-7831
Email address: mk-eikyohyoka@city.yokohama.lg.jp
Page ID: 801-054-709