- Yokohama-shi Top Page
- Living and Procedures
- Community Development and Environment
- Environmental Conservation
- Environmental Conservation Initiatives
- Environmental assessment
- Business outside Yokohama
- Public inspection, etc.
- Kawasaki Plant (Ogicho area) Plan for Replacement of thermal power generation facilities (provisional) Environmental considerations
Here's the text.
Kawasaki Plant (Ogicho area) Plan for Replacement of thermal power generation facilities (provisional) Environmental considerations
Last Updated July 5, 2024
Plan Stage Environmental Considerations
Kawasaki Plant (Ogicho area) Thermal power generation equipment replacement plan (provisional) planning stage Environmental considerations Please refer to the following PDF file.
However, it is not possible to print or edit files due to the business's circumstances.
In addition, texts, photos, diagrams, etc. in the PDF file are subject to copyright.
Unless permitted by copyright law, such as "copying for private use" or "quoting", copying or diverting without permission is prohibited.
Plan Stage Environmental Considerations
Planning stage Environmental Consideration Book Collective Version (PDF: 77,597KB)
- Cover (PDF: 165KB)、Table of Contents (PDF: 142KB)
- Chapter 1 The name of the person who intends to implement the Class 1 Project, the name of the representative and the location of the main office (PDF: 231KB)
- Chapter 2 Purpose and contents of Class 1 Business (PDF: 5,555KB)
- 2.1 Purpose of Class 1 Business
- 2.2 Contents of Class 1 Business
- Chapter 3 Overview of the Project Implementation Area and its surroundings
- Results of surveys, predictions and evaluations on matters to be considered at the planning stage for Chapter 4 Type 1 projects (PDF: 2,618KB)
- 4.1 Selection of items to be considered at the planning stage
- 4.2 Selection of methods for investigation, prediction and evaluation
- 4.3 Results of investigation, prediction and evaluation
- 4.4 Comprehensive evaluation
- Chapter 5 Planning Stage Name of the business entrusted with the environmental consideration book, the name of the representative, and the location of the main office (PDF: 234KB)
Summary
- Cover, Table of Contents
- Chapter 1 The name of the person who intends to implement the Class 1 Project, the name of the representative, and the location of the main office
- Chapter 2 Purpose and Contents of Class 1 Business
- Chapter 3 Overview of the Project Implementation Area and its surroundings
- Chapter 4 Surveys, forecasts and evaluations on matters to be considered at the planning stage for Class 1 projects
- Chapter 5 The name of the business operator entrusted with the environmental consideration book, the name of the representative, and the location of the main office
Remarks
- The map used in the PDF file is created by processing the Geographical Survey Institute tiles and basic map information of the Geographical Survey Institute.
- If a third party duplicates further, it must obtain the approval of the head of the Geographical Survey Institute.
Status of Procedures
Please refer to “10. Kawasaki Plant (Ogicho District) Thermal Power Plant Replacement Plan (provisional) Environmental Impact Assessment Procedures” for the status of this project.
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau
Telephone: 045-671-2495
Telephone: 045-671-2495
Fax: 045-663-7831
Email address: mk-eikyohyoka@city.yokohama.lg.jp
Page ID: 542-447-504