Sueyoshi Bridge Rebuilding Project

Last Updated July 22, 2024

Aerial photograph


Progress of construction

This project started substructure work in 2019, and is proceeding with construction with the goal of completion in 2029.
In December 2021, we switched the roadway traffic to the temporary bridge installed on the downstream side, and started the removal of the existing bridge.
Removal of the existing bridge frame was completed in May 2023, and construction of a new bridge has been started since 2023!
Please refer to "Sueyoshi Bridge News" for details of construction progress.

News on Sueyoshi Bridge News and Construction

July 22, 2024 Sueyoshi Bridge News (No. 9) was published (PDF: 1,799KB)
September 7, 2023    News of road regulation (daytime) implementation 4 (change) (PDF: 1,173KB)
August 22, 2023 Notice of Road Regulations (Daytime) Implementation 3 (PDF: 1,331KB)
August 10, 2023 Notice of Road Regulations (Daytime) Implementation 2 (PDF: 1,307KB)
July 24, 2023 Notice of Road Regulations (Daytime) Implementation 1 (PDF: 1,211KB)
June 22, 2023 Sueyoshi Bridge News (No. 8) was published (PDF: 3,424KB)
June 25, 2022 Sueyoshi Bridge News (No. 7) was published (PDF: 1,109KB)
December 2, 2021 Notice of Change of Roadway and Request for Cooperation (Detailed Date and Time) (PDF: 1,895KB)
November 17, 2021 Notice of Change of Roadway and Request for Cooperation (PDF: 1,895KB)
October 24, 2021 Sueyoshi Bridge News (No. 6) was published (PDF: 1,071KB)
March 23, 2021 Sueyoshi Bridge News (No. 5) was published (PDF: 1,503KB)
February 24, 2021 Notice of Change of Roadway and Request for Cooperation (PDF: 568KB)
January 25, 2021 Notice of one-way alternate traffic at night on the roadway and request for cooperation (PDF: 419KB)
January 12, 2021 Notice of change of sidewalk and request for cooperation (PDF: 253KB)
November 25, 2020 Sueyoshi Bridge News (No. 4) was published (PDF: 1,798KB)
About traffic regulation of roadway and sidewalk with construction on September 11, 2020 (PDF: 310KB)
July 28, 2020 Sueyoshi Bridge News (No. 3) was published (PDF: 1,240KB)
June 10, 2020 Notice of River embankment road "closed" accompanying construction and cooperation of "detour" (PDF: 1,574KB)
March 24, 2020 Sueyoshi Bridge News (No. 2) was published (PDF: 2,316KB)
November 29, 2019 Sueyoshi Bridge News (No. 1) was published (PDF: 587KB)
November 18, 2019 We made construction summary brochure (PDF: 7,482KB)
October 23, 2019 Notice of river embankment road "closed" with construction and cooperation of "detour" (PDF: 1,239KB)

Sueyoshi Bridge (Tsurumi River) Rebuilding (substructure) Briefing Session

Construction briefings were held on June 22, 27, 29, and July 7, 2019 (*). .
※July 7 was held at the board meeting of the Kokura 5 Neighborhood Associations Federation in Sachi Ward, Kawasaki City.
Explanatory materials (PDF: 7,954KB)
Summary of the Minutes (PDF: 199KB)

Progress as seen in aerial photographs

Transition of Construction


Business

Business Overview

Sueyoshi Bridge is located on the prefectural road Tsurumi Mizonoguchi, designated as an emergency transportation road, and is an important bridge over the Tsurumi River. The up lane (upstream side) was constructed in 1950, and the down lane (downstream side) was constructed in 1964. It is hindering the safe traffic of pedestrians.
For this reason, in order to replace the building, we proceeded with surveys, design and discussions with related organizations as a joint project between Yokohama City and Kawasaki City in 2015, and started substructure construction work from FY2019.

Business Locations

From Kamisueyoshi 5-chome (right bank) in Tsurumi-ku, Yokohama to Kokura 5-chome (left bank) in Saiwai-ku, Kawasaki-shi

Fiscal year

From 2015 to 2029

Outline of the plan

Status before the start of business

Bridge length: 107.86ⅿ
Width: 12.65m (roadway: 4.5m x 2 steps: 1.5m x 2)

New bridge (completed image)

Forecast of completion
The completed drawing is an image and is subject to change.

Right turn lane drawing
As mentioned above, a new right-turn lane will be established to reduce traffic congestion.

Bridge length: 108m
Width: 18.8m (roadway 3.25m x 2 + 3m x 1 (right turn lane), sidewalk 3.75m x 2)

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Return to the previous page

Page ID: 878-003-428

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews