Menu

Close

Here's the text.

Town development (text version) of Yokohama Everyone

Yokohama City Barrier-Free Basic Concept

Last update date April 8, 2024

In this booklet, we will introduce barrier-free towns that we will promote in the "Yokohama Barrier-Free Basic Design".
 

What is the Basic Concept for Barrier-Free?

 In areas centered on passenger facilities such as railway stations, facilities used by the elderly and disabled gather, and in areas where transportation between facilities is usually performed on foot (priority maintenance areas), public transportation, This is a concept created to promote barrier-free facilities such as buildings, roads, off-street parking lots, city parks, traffic lights, etc.
 In "barrier-free basic design", we determine range of important maintenance district, contents of business (specific business) to be carried out for barrier-free are determined. The aim is not only to make individual facilities barrier-free, but also to make "area and integrated barrier-free" that ensures the continuity of buildings and roads.
 Yokohama City is promoting barrier-free urban development based on this basic concept.

Maintenance projects based on the Basic Concept of Barrier-Free Basic Concept

 Based on "barrier-free basic design", each company carries out business of barrier-free in important maintenance district.

Public transport specific business

Business related to barrier-free access to passenger facilities

Road identification business

Business related to barrier-free sidewalks, etc.

Traffic Safety Specific Business

Business related to the installation of acoustic signals

Building-specific business

Business related to barrier-free buildings

City park specific business

Business related to barrier-free park

Off-Street parking lot specific business

Business related to barrier-free off-street parking lots
Specified off-street parking lot is a parking lot that has a parking space of 500 square meters or more and a parking fee is collected.

Basic flow of examination of barrier-free basic concept

It takes approximately three years to formulate the barrier-free basic concept. Based on the examination of the first to third subcommittees, we will determine the barrier-free basic concept. After the development of the basic design, the facility installation managers will carry out specific projects positioned in the basic design.
 The basic flow of the examination of the basic barrier-free concept is as follows.

1st year

・1st meeting was held
 We will consider the range, routes, and facilities to be barrier-free.
・Town walk inspection and workshop
 We will conduct barrier-free inspections in the town and discuss issues at workshops.
・Barrier-free opinions
 We will solicit opinions on barrier-free information on paper and on the web.

2nd year

・Summary of opinions, hearing of facility installation managers, etc.
 It will be held in Yokohama.
・2nd ward assembly
 About problem that came out in town walk inspection and opinion offer, we examine countermeasures.
・Coordination with facility installation managers
 Coordination measures will be made by Yokohama City and facility installation managers.

3rd year

・The 3rd Ward Meeting
 We will consider the timing of implementation of the countermeasures and propose a draft basic plan.
・Determination of basic plan
・Consultation with facility installation managers, etc. based on the law
 We hold discussion based on law between Yokohama-shi and facility setting managers.
・Determined basic concept
・Preparation of specific business plan
 Please make each facility setting managers who carry out specific business should make.

From the fourth year

・Implementation of specific projects
 Each facility setting managers who have you carry out specific business will carry out.

Town of Yokohama, which is replaced by a basic barrier-free concept

 Based on the "Barrier-Free Basic Design", typical examples of specific businesses implemented by each facility installation managers are as follows.

Public transport specific business

・Ticket vending machine renovation
The renovation of the ticket vending machine has made it easier to use.
・Home doors or movable platform fences
・Use of communication boards and writing tools
We have prepared communication tools for various people, such as hearing impaired, foreigners, and the elderly.

Road identification business

・Improvement of pavement material
Changed to a material that is easy for any person to move.
・Improvement of drain lids
If the lid is too large, the wheel of the wheelchair will fit, so the hole in the lid is reduced to make it easier to move.

Traffic Safety Specific Business

・Installation of acoustic signals

Building-specific business

・Installation of blocks for guiding visually impaired persons at the entrance
・Installation of two-tier handrails on stairs

City park specific business

・Toilet renovation
 The space has been expanded to make it easier to use even in wheelchairs, and handrails have been installed.
・Securing parking space for wheelchairs
・Garden road renovation
 Pavings have been installed on the garden road to make it easier for wheelchairs and strollers to pass.

Education and awareness-raising specific business

・Education and training necessary to facilitate movement
・Awareness-raising activities to prohibit illegal bicycle parking
・Holding barrier-free classes

Contact information

Planning and Coordination Department, City of Yokohama, Road and Highway Bureau
Published in November 2023
〒231-0005 6-50-10, Honcho, Naka-ku, Yokohama-shi
Phone number 045-671-4086
Fax 045-651-6527
E-mail address do-barrierfree@city.yokohama.jp

For inquiries to this page

Road and Highway Bureau Road Policy Promotion Division

Phone: 045-671-4086

Phone: 045-671-4086

Fax: 045-651-6527

Email address: do-barrierfree@city.yokohama.jp

Return to the previous page

Page ID: 786-163-111

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews