How to proceed with flushing work
Last Updated April 16, 2021
The flushing work is carried out at a designated construction shop in Yokohama.
If drainage facilities are not installed based on standards such as laws and regulations, it will not only hinder the maintenance and management of public sewers, but everyone will also be damaged, so washing work is a designated construction shop in Yokohama City You can only do it.
△Designated construction shops are introduced by the Yokohama City Pipe Works Cooperative. (Phone: 045-681-6631)
Meeting, quotation and contract
After receiving an explanation of the details of the construction, check the construction cost, construction time, whether or not subsidies or loans are used, etc. before contracting.
Examples of construction work
Lay drainage pipes from drains such as toilets, kitchens, bathrooms, etc. to connect.
Place the rainwater pipe until the rainwater is connected. (In the case of a split type)
Collect, clean, disinfect, and backfill the septic tank (toilet tank).
Install the toilet bowl and water tank, and piping the water supply pipe. (In the case of remodeling of toilets)
From construction contract to payment
Inquiries to this page
Public Works Office Kounan, Kounan-ku
Telephone: 045-843-3711
Telephone: 045-843-3711
Fax: 045-845-6489
Email address: kn-doboku@city.yokohama.lg.jp
Page ID: 533-125-885