- Yokohama-shi Top Page
- Municipal Government Information
- Finance and Accounting
- Comprehensive adjustment of public works projects
- Design and Construction of Public Works
- Common specifications for civil engineering design, surveying and geological survey work
- Common specifications for civil engineering design, surveying and geological survey work
Here's the text.
Common specifications for civil engineering design, surveying and geological survey work
Last Updated October 20, 2023
In September 2021, "Public Works Design Work Common Specifications", "Survey Work Common Specifications", and "Geological Survey Work Common Specifications", which are part of the contract documents for design and surveying, were revised.
We are reviewing the seal signatures in the relevant documents and will continue to require some forms of seal signatures.
Please refer to the list of construction documents (simplification of construction documents, review of seal).
In addition, in civil engineering design, surveying, geological survey work, ASP (information sharing system) has not been introduced in Motoichi, so please check the submission method (document / email) of the construction-related documents list.
Article 118-5 of the "Common Specifications for Surveying Work", Article 118-5 of the "Common Specifications for Geological Survey Work", and Article 117-5 of the "Common Specifications for Civil Engineering Design Work", "The trustee must submit a certification by a third-party organization with the skills related to certification separately specified in the database. Although it was not applicable, an agreement was concluded with the National Land and Ground Information Center, a third-party organization, in Motoichi, so it will be applied from the work ordered according to the January 2022 standard.
・About registration of ground information database (including construction with geological survey) (PDF: 99KB)
Download common specifications for commissioned work
Civil engineering work
Common specifications for civil engineering design work (revised in September 2021) (PDF: 298KB)
Common specifications for civil engineering design work (revised in August 2020) (PDF: 449KB)
Common specifications for civil engineering design work (revised in July 2016) (PDF: 452KB)
Surveying
Common Specifications for Surveying Operations (revised in September 2021) (PDF: 266KB)
Common Specifications for surveying work (revised in August 2020) (PDF: 403KB)
Common Specifications for surveying work (revised in July 2016) (PDF: 401KB)
Geological Survey
Common specifications for geological survey work (revised in September 2021) (PDF: 367KB)
Common specifications for geological survey work (revised in August 2020) (PDF: 563KB)
Common specifications for geological survey work (revised in July 2016) (PDF: 571KB)
Reference materials for revision in September 2021
Reference materials related to the revision in August 2020
- August 2020 Q & A on Common Specifications for Outsourcing Services (PDF: 334KB)
- Common specifications for civil engineering design work (new and old comparison table) (PDF: 281KB)
- Common specifications for surveying work (new and old comparison table) (PDF: 253KB)
- Common specifications for geological survey work (new and old comparison table) (PDF: 284KB)
Link
- Collection of outsourcing work styles for design, surveying, etc. [for trustees]
- Contract services for design, surveying, etc. (contracts, regulations, outlines) (outside site)
To the page of Yokohama Bidding, Bidding and Contract-Related Regulations
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Public Works Coordinating Division, Facility Management Promotion Department, Finance Bureau Facility Management Promotion Office
Telephone: 045-671-2025
Telephone: 045-671-2025
Fax: 045-651-7599
Email address: za-kjchosei@city.yokohama.jp
Page ID: 362-500-024