Menu

Close

  1. Yokohama-shi Top Page
  2. Business
  3. Bidding and Contracts
  4. Orders for each ward office
  5. 2024
  6. Electricity, etc.
  7. Decarbonization, GREEN x EXPO Promotion Bureau
  8. [Results] [Public proposal type proposal] Project to introduce renewable energy to schools (open call for participants in FY2024)

Here's the text.

[Results] [Public proposal type proposal] Project to introduce renewable energy to schools (open call for participants in FY2024)

Last Updated November 15, 2024

denryoku_proposal

Title

Project to introduce renewable energy to schools (open call for participants in FY2024)

Proposal results

Order information

Date of public notice

August 13, 2024

Eligibility

Events (electricity, etc.)

Location classification

Corporate size

Other Conditions

All of the following conditions shall be satisfied. In addition, we correspond to this when city demands presentation of document which can confirm that we meet qualification requirements.
(1) (8) must be satisfied by one representative company.
In addition, contracts with Motoichi that occur in this business shall be concluded with representative company.
(1) Person who has registration of any of the following conditions in Yokohama-shi general competitive bidding qualified person list (article, trust) in Reiwa 5.6. In addition, if it has not yet been listed in the list of qualified general competitive bidding qualifications, but at the time of submitting the application form for participation, if you are currently applying for any of the following events, the date to identify the contract candidate By the time, it is deemed to be a registered person, provided that the registration has been completed.
A. “327: Maintenance of electrical equipment Subscription A: Indoor electricity”
B. “350: Other outsourcing, etc., that there is a description of the installation or operation of energy equipment *”
※ESCO business, Virtual Power Plant (VPP) business, PPA (electricity sales contract) business, etc.
C “501: Electricity and City Gas Substance A: Electricity Supply”
(2) Those who have not received the nomination suspension measures under the provisions of the "Yokohama City Nomination Suspension Measures Guidelines (April 1, 2004)" from the deadline for submitting the application form to the specific date of the contract candidate.
(3) Gangsters stipulated in Article 2, item 2 of the Yokohama City Gangster Exclusion Ordinance (December 2011 Yokohama City Ordinance No. 51), gangsters stipulated in item 4 of the same Article, etc. Not be a person who is deemed to have a close relationship with a gangster management governing corporation, etc. or a gangster prescribed in Article 7 of the Ordinance (including cooperating businesses included in the system for carrying out this business).
(4) Persons who have not violated Article 23, Paragraph 1 or Paragraph 2 of the Kanagawa Prefectural Gangster Exclusion Ordinance (2010 Kanagawa Prefectural Ordinance No. 75) (including cooperating businesses included in the system for implementing this work) )
(5) Do not fall under the provisions of Article 167-4 of the Local Autonomy Law Enforcement Ordinance (Government Ordinance No. 16 of 1947).
(6) In accordance with the Bankruptcy Law (Act No. 75 of 2004), no petition for commencement of bankruptcy proceedings has been filed and no decision has been made to commence.
(7) Have not been subject to suspension of bank transactions.
(8) A petition for commencement of rehabilitation proceedings pursuant to the Corporate Rehabilitation Act (Act No. 172 of 1952) or a petition for rehabilitation proceedings pursuant to the Civil Rehabilitation Act (Act No. 225 of 1999) has not been filed (rehabilitation or rehabilitation proceedings) Excluding those who have been decided and who have recognized by Yokohama City that there is no risk of falling into unperformance).
(9) Have a business performance similar to this project (two projects have been implemented for “equipment design and introduction of photovoltaic power generation facilities on the roof or roof of high-pressure facilities” during the period from FY2019 to FY2023). However, the actual results do not have to be business results in Motoichi. In addition, the results of cooperating companies included in the system for implementing this work may be used.
(10) A person with the following qualifications can be included in the system to carry out this work.
Oh, first-class architect of structural design according to the Architect Law (Law No. 202 of 1950)
(i) Chief Engineer of Electricity (Type 3 or higher)

Date of hearing

Date of hearing (time, etc.)

It's finished.

About application

Documents to be submitted

Representative companies who intend to participate in this proposal must submit a participation intention application form (Form 1) and a written oath (Form 2).

Place of submission

〒231-0005 10 Yokohama City Hall 30th Floor, 6-50 Honcho, Naka-ku, Yokohama City Hall
Yokohama City Decarbonization / GREEN x EXPO Promotion Bureau Carbon Neutral Business Promotion Section
Mr. Takase, Utsumi
TEL 045-671-4155
Email address da-ppa@city.yokohama.lg.jp

How to apply

Bring or mail (registered registered mail, registered mail)
・In the case of mailing, be sure to contact the submission address after shipping.
・In the case of bringing, after telephone call in advance, from 9:00 am to noon on weekdays, from 1:00 pm to 5:00 pm, Decarbonization / GREEN x EXPO Promotion Bureau Carbon Neutral Business Promotion Section (Yokohama City Hall 30th floor) ), Hand it to the person in charge.

Submission period

The reception has been closed.

Application deadline

August 28, 2024

Related materials

Related materials

Question answer

If you have any questions about the contents of these guidelines, etc., submit a questionnaire (Form 3) as follows. Questions and answers will be notified to all persons who have confirmed that they are qualified for the proposal.
If you do not have any questions, you do not need to submit a questionnaire.
(1) Submission deadline
 5:00 pm on Wednesday, September 11, 2024 (must arrive)
※Questions after the deadline will not be accepted at all.
(2) Submission method
 E-mail
(3) Destination
 The same as where to submit the application
(4) Sending answers
 Answer by e-mail by 5:00 pm on Thursday, September 19, 2024.

Notification of eligibility confirmation and submission request

[Notice of Participation Eligibility Confirmation Results]
Confirm that the applicant who submitted the application form satisfies the qualifications of the proposer, and notify all applicants who intend to participate in the proposal qualification confirmation result notification. At the same time, a proposal-related document submission request will be issued to all persons who have confirmed that they are satisfied with the proposal qualifications.
Notification date: Send by e-mail by 5:00 pm on Wednesday, September 4, 2024.

[Request for Submission]
If you are qualified to make a proposal, please carefully check the proposal preparation procedure and submit the proposal.
(1) Number of copies submitted: 8 copies (primary copy, 7 copies)
(2) Submission address  :The same as where to submit the application
(3) Submission deadline: 5:00 pm on Friday, October 4, 2024 (must arrive)
(4) How to submit: Bring or mail (registered registered mail, registered mail)
・In the case of mailing, be sure to contact the submission address after shipping.
・In the case of bringing, after telephone call in advance, from 9:00 am to noon on weekdays, from 1:00 pm to 5:00 pm, Decarbonization / GREEN x EXPO Promotion Bureau Carbon Neutral Business Promotion Section (Yokohama City Hall 30th floor) ), Hand it to the person in charge.

Other Documents and Communications

None

Ordering Division

Order Section Information
Items Information for each item
Section in charge Board of Education Secretariat General Affairs Division Accounting Section
Address 〒231-0005 6-50-10, Honcho, Naka-ku, Yokohama-shi
Phone number 045-671-3292
Fax 045-663-5547
Other contact information ky-keiri@city.yokohama.jp

Contract Section

The same as the Ordering Division

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Decarbonization / GREEN × EXPO Promotion Bureau Carbon Neutral Business Promotion Division, Decarbonized Society Transition Promotion Department

Telephone: 045-671-4155

Telephone: 045-671-4155

Fax: 045-550-3925

Email address: da-cn@city.yokohama.lg.jp

Return to the previous page

Page ID: 331-882-348

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews