Information for Yokohama-shi apartment earthquake proofing repair promotion business

Last update date July 6, 2020

About urgent correspondence to affect new coronavirus infectious disease

With emergency declaration, receptionist by mail carries out some procedures from the viewpoint of prevention of infection spread for the time being, too.
For more details, please consult.
  • When you come to window, I would like cooperation in disinfection of finger with wearing and alcohol antiseptic solution of mask.
  • You may have to wait outside work room to avoid "closeness" and state of "crowd" when window was crowded. As we invite in turn, I apologize for the inconvenience, but I would like cooperation.

Purpose of business

For apartment Residential Association carrying out earthquake-resistant repair, we assist earthquake proofing repair design costs, construction control costs to modify earthquake proofing repair construction cost and earthquake proofing repair work to promote earthquake-resistant repair of condominium, and to promote safe town planning resisting earthquake.

Target building

Target building

Target building shall satisfy all following

A

In condominium where Partitionary Property Act that gets building certification before the end of May, 1981, and was started construction of is applied to, we correspond to any of the following. (we change from April 1, 2014)

  • Apartment where division owner lives in more than half of the number of the dwelling units
  • Apartment where number of floors has 1,000m2 or more in 3 or more and total floor area

※ In the case of uses except apartment house such as stores, half or more of total floor area are inapplicable

iApartment which was judged "to need earthquake-resistant repair" as a result of this diagnosis (diagnostic work-up) by Motoichi system
※ When we carry out earthquake proofing repair work partly without using assistance system of city after having consulted case carrying out earthquake-resistant diagnosis and this diagnosis by Motoichi system without using Motoichi system, please consult with city.
Cormorant

Evaluations by (※ 1) such as earthquake-resistant judgment organizations about validity of repair plan earthquake-resistant at the time of earthquake-resistant repair design and getting either authorization from next 1 to 3 or confirmation as needed (※ 2) (change from April 1, 2017)

  1. Authorization of earthquake-resistant repair plan of building based on regulations of earthquake-resistant repair promotion law Article 17 Paragraph 3
  2. Building certification based on regulations of Building Standard Act Article 6 Paragraph 1 or 2 Paragraph 1 of Article 6
  3. Authorization of master plan based on regulations of 8 Paragraph 1 of Building Standard Act Article 86

[explanatory note]
※Earthquake-resistant judgment engine registered with "existing building earthquake proofing diagnosis, repair promotion whole country network Committee" (the outside site) (outside homepage) or the mayor says that and the same class and admitting engine with 1 "earthquake-resistant judgment organizations".
※In the case of earthquake-resistant repair design using 2 part repair system, the authorization from 1 to 3 mentioned above, please assume plan that is the acquisition-free.
[apartment which earthquake proofing diagnosis imposes duty explanatory note, and is done]
1.Emergency security confirmation large-scale construction thing required
  In apartment where facilities which a large number of people who raised in earthquake-resistant repair promotion law supplementary provisions Article 3 Paragraph 1 used were added to and apartment which says large-scale thing, and corresponds to requirements of all following.

2.Security confirmation plan mention building required
  It is said with thing that is constant height or more in apartment along road which city appointed as road which should secure traffic at the time of earthquake disaster to advocate in earthquake-resistant repair promotion law Article 7 Paragraph 1 No. 3, following zen
  Apartment which corresponds to teno requirements.

※ And "confirmation of being building targeted for earthquake-resistant diagnosis imposition in earthquake-resistant repair promotion law" submits "prior consultation book" (word: 35KB) to City of Yokohama, Housing and Architecture Bureau Planning architecture Disaster Prevention Section (Excel: 24KB) before submitting subsidy grant applications, and it is necessary to confirm that we correspond to 1 mentioned above or 2.

OhDo not receive order to affect earthquake-resistant repair based on Building Standard Act.

※Requirements about scales of building disappeared from 2013.
※Please collect tripartite quotation from the above.
※When we submit subsidy grant application or the whole design approval application by March 31, 2021, regardless of amount of money of operating cost, we can collect quotation from the suburbs company. (we change from April 1, 2017)

※We are of application receptionists about thing that earthquake-resistant repair design or earthquake-resistant repair work (including construction control) is completed in 2019.
※As you may not accept depending on the situation of budget, you are before resolutions of the collection of quotation and general meeting of Residential Association, and please talk with building Disaster Prevention Section in advance by all means. (but prior consultation does not make a definite promise of grant of subsidy. One set of required documents performs acceptance in regular order not turn of prior consultation.)

Supporting contents

We assist sum to raise about earthquake-resistant repair design costs, construction control costs to affect earthquake-resistant repair construction cost and earthquake-resistant repair work in expenses required for earthquake-resistant repair work next in limit.
In addition, as for the construction control to affect earthquake-resistant repair design and earthquake-resistant repair work, the earthquake-resistant repair promotion law enforcement regulations Article 5 Paragraph 1 first or authorized architect corresponding to No. 2 decides to carry out. (we change from April 1, 2017)
In addition, please refer to building Disaster Prevention Section as it is supporting amount of money depending on expense burden on public group ratio in the apartment with parts which public group owns such as local public entities.

Supporting contents
AEarthquake-resistant repair design
Frame which has low either in the following amounts of money
・2/3 of earthquake-resistant repair design costs (company estimated cost ※ 1)
・2/3 of sum that multiplied 1,000 yen/m2 by total floor area of apartment, and increased 5.4 million yen
※We can include expense to affect "evaluation by earthquake-resistant judgment organizations about validity of earthquake-resistant repair plan" in 1 "earthquake-resistant repair design costs".
iConstruction control to affect earthquake-resistant repair work
2/3 of construction control costs to affect earthquake-resistant repair work (company estimated cost)
Cormorant

(1) The whole repair work (repair work that the whole apartment becomes safe from earthquake by one construction)
Frame (※ 3) which has low either in 1/3 of earthquake-resistant repair construction cost (company estimated cost) or the following limits (※ 4)

Limit
Total floor area
(we calculate for each ridge by the handling in Building Standard Act)
Limit
Less than 5,000m220 million yen
It is less than 10,000m2 5,000m2 or more35 million yen
10,000m2 or more50 million yen

(2) Stage repair work (and we divide construction into twice repair work that the whole apartment is safe from earthquake)
Frame (※ 2) which has low either in 1/3 of earthquake-resistant repair construction cost (company estimated cost) or the following limits (※ 3)

Limit
Total floor area
(by the handling in Building Standard Act
We calculate for each ridge)
The first earthquake proofing repair work
It is limit of this
The second earthquake proofing repair work
It is limit of this
Less than 5,000m210 million yen20 million yenFrom the left sum
By the first earthquake proofing repair work
Supporting sum that was issued
Sum that we deducted
It is less than 10,000m2 5,000m2 or more17.5 million yen35 million yen
10,000m2 or more25 million yen50 million yen

(3) Partial repair work (construction to repair weak points of piloti floors for leading)
Frame (※ 3) which has low either in 1/3 of earthquake-resistant repair construction cost (company estimated cost) or the following limits (※ 4)

Limit
Total floor area
(in Building Standard Act
Of this by the handling
We calculate for each ridge)

The first earthquake proofing
Of repair work
Limit

furuiaratameshukoji after the second
It is limit of this
Limit of the last construction (construction that the whole apartment becomes safe)
Less than 5,000m210 million yen16 million yen

From the left sum
Sum that deducted supporting sum issued by earthquake-resistant repair work so far

20 million yenFrom the left sum
Sum that deducted supporting sum issued by earthquake-resistant repair work so far
5,000m2 or more
Less than 10,000m2
17.5 million yen28 million yen35 million yen
10,000m2 or more25 million yen40 million yen50 million yen

[explanatory note]
※But 2 "apartments which corresponds to "buildings constant height or more" which building lot of apartment wins close to "road which should secure traffic at the time of earthquake disaster" (PDF: 310KB)" (PDF: 22KB),
Frame which has low either in limits of 2/3 or the table mentioned above of earthquake-resistant repair construction cost
We do this. (we change from November 25, 2013)
※When 3 apartments correspond to "emergency security confirmation large-scale construction thing required" or "security confirmation plan mention building which earthquake-resistant diagnosis is obliged to required", we may receive assistance by earthquake proofing measures emergency promotion business of country separately.
⇒ We perform application through city. For more details, please refer to City of Yokohama, Housing and Architecture Bureau Planning architecture Disaster Prevention Section.

[application documents]

Please confirm documents at the time of application of earthquake-resistant repair design or earthquake-resistant repair work in the following check lists.

* Submission documents check list (earthquake-resistant repair design) (PDF: 82KB)

* Submission documents check list (construction control to affect earthquake-resistant repair work and earthquake-resistant repair work) (PDF: 84KB)

Brochure

System summary, the supporting point

Then, it is contents as of April 1, 2020, and supporting contents may be changed by system revisions of country.

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

Housing and Architecture Bureau Planning architecture Disaster Prevention Section