Site of Industrial Waste landfill

 In Motoichi, about land use in ruins of waste landfill in the city, "law about disposal and cleaning of waste (hereinafter referred to as" law "). "and" Enforcement Guidelines for Change of landfill Ruins (hereinafter referred to as" Guidelines ") "Guidelines for the Use of the landfill Site in Yokohama (hereinafter referred to as" Summary ") Based on this, we provide guidance on changes in land characteristics.

Last update date April 1, 2023

1 Designated area of industrial waste landfill in the city

 Based on the provisions of Article 15-17 of the Act, the site of the designated landfill in the city has been designated as a designated area. As of March 1, 2021, there are 34 designated areas of industrial waste landfill in Yokohama, and there are no designated areas for general waste landfill. For more information, please refer to the documentation.

2 Land use at the site of landfill

 In land use in ruins of landfill in the city, we provide guidance by summary (compliant with law and guidelines).
 About contents of summary, we put together in "guidance summary guide to affect use of Yokohama landfill ruins".


[Reference]


 The outline of the outline is as follows.

(1) Target area

 The site of landfill that is not designated as a designated area is also subject to the outline. The site of landfill municipal solid waste and landfill that has been landfilled but has not been abolished. You can check the site of landfill other than the designated area by browsing at the Business Waste Management Section. In the case of the next agency, please contact the reference at the bottom of the page.

(2) Outline of instruction

 In the use of the former site of waste landfill, the generation of gas and sewage may cause damage to the former site users and hinder the living environment in conservation. Therefore, the outline requires that the site be used after a preliminary survey and a countermeasure plan be formulated according to the contents of the site, and then use the site.

(3) About administrative procedures

 When using the site, please perform the administrative procedures described in the following (4) to (7). For details, please refer to [Administrative Procedure Flow] (PDF: 52KB).

(4) Prior consultation

 The use of the former site of waste landfill may hinder the living environment in the conservation depending on the changes in the characteristics of the land. Please contact the Waste Management Section for prior consultation.

(5) Preliminary survey

 Depending on the contents of the site, it is necessary to investigate in advance the soil cover, the properties of landfill waste, the gas components remaining in the waste layer, the quality of leachate from the waste, etc. Before conducting the survey, submit a plan in advance and a result report after the survey.

(6) Measures to use the former site

 Please understand the characteristics of the former site of landfill through a preliminary survey before implementing countermeasures. In the countermeasures, please submit a plan before starting the countermeasure construction and a completion report after the countermeasure construction.

(7) Response in the event of an abnormality or emergency disaster

 If abnormalities such as subsidence and gas generation occur after measures to use the site, report the situation immediately and discuss it. In addition, please talk about plan contents in the same way when you change shape, scale of ruins use measures construction established in ruins.
 If an emergency disaster occurs and the site is used as a first aid measure, please report the details immediately.

(5)(6)required documents in (7) is as shown in the following table.

required documents
Pre-surveyAfter a preliminary surveyPreparation of countermeasuresMeasures after construction(Emergency disaster, etc.)
Changes in land characteristics registration form
(Style No. 35)] (word: 20KB)

Or [Preliminary Survey of Use of Sites
Plan (style 1)] (word: 26KB)
[Preliminary survey on site use]
Completion report (Form 2)] (word: 26KB)
Changes in land characteristics registration form
(Style No. 35)] (word: 20KB)

Or [Measures to use the former site
Plan (style 3)] (word: 26KB)
[Measures for Use of Sites
Completion report (Form 4)] (word: 26KB)
Changes in land characteristics registration form
(Style No. 35)] (word: 20KB)

Or [Measures to use the former site
Completion report (Form 4)] (word: 26KB)
Investigation planSurvey resultsConstruction planCompletion Completion Report
Drawings defining the scope of the surveyDrawing that clarifies the scope of enforcement
Measures plan or results of countermeasures to be implemented regarding the impact on the surrounding living environment
Floor plan, cross-sectional view, etc. that can grasp the positional relationship of the former site facility
Documents confirming compliance with the law enforcement regulations (Article 12-40 of the Enforcement Regulations)
Others that the mayor deems necessary

 If the site use area corresponds to a designated area, use the change of land characteristics registration form (Form No. 35), and for notifications before pre-survey and before countermeasure construction, 30 days from the date of the survey / construction start date You must submit a report such as an emergency disaster occurrence to the mayor within 14 days from the construction start date.

Glossary of Laws

  • Changes in land characteristics

 This is a change in the shape or property of the land. For example, residential land development, excavation of land, installation of structures, clearing, etc., and includes acts that do not involve the removal of waste.

  • A person who intends to change land characteristics

 A person who decides the contents of a plan for changing land characteristics. For example, in the relationship between land owners and developers who rent the land and conduct development activities, developers fall under this. "Persons who are going to change the characteristics of land" must notify Motoichi in advance about enforcement methods about change of character of land.

  • Notification of change in land characteristics

 The form of registration form, attached documents and drawings, and trait changes that do not require notification are stipulated in Article 15-19 and others. Please confirm in "Excerpt of laws and regulations about designated area (PDF: 511KB)".

  • Standards for Enforcement of Change of Land Characteristics

 The standards are stipulated in Article 12-40 of the Enforcement Regulations. Please confirm in "Excerpt of laws and regulations about designated area (PDF: 511KB)". In addition, the Ministry of the Environment has indicated guidelines (external site) by notification.

[Excerpts of laws and regulations concerning designated areas]
Excerpts of laws and regulations concerning designated areas (PDF: 511KB)

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Resources and Waste Recycling Bureau Business Waste Management Department Business Waste Management Section

Phone: 045-671-2547

Phone: 045-671-2547

Fax: 045-663-0125

Email address: sj-syorishisetsu@city.yokohama.jp

Return to the previous page

Page ID: 106-180-826

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews