About private road maintenance

Last Updated January 1, 2022

Private road maintenance and subsidy

In Yokohama-shi, city subsidizes a part of construction cost when local people maintain pavement work about private road which many citizens pass and are used in the same way as action We carry out two business of "private road maintenance subsidy program" and "private road maintenance system" that city performs pavement construction on behalf of local everybody.

Targets of private road maintenance and subsidies

Details table
 Private road maintenance subsidy system
(Contents of construction: pavement work and incidental work)
Private road maintenance system
(Contents of construction: pavement construction)
Conditions, etc.(1) Private roads used by local people for their daily lives, and roads connected to the private roads are already paved.
(2) There must be no underground buried objects that hinder pavement work, and the upper slope (so-called cliffs) in contact with the private road is protected to the extent that pavement work is not hindered.
(3) In sewer treatment area, appropriate sewage pipe or confluence pipe is maintained.
(4) For a dead-end driveway, one end is connected to public roads, and in principle, it is used at the main entrances of five or more dwellings (apartment such as apartments is treated as one house for each building).
Private roads that are used by many citizens and have the same function as public roads, with unpaved or severely damaged pavement.

(1) Private roads within a radius of approximately 500 meters from public facilities such as railway stations, ward offices, elementary and junior high schools, and libraries, or private roads newly designated as school roads with a width of 2.7 meters or more.
(2) Both ends are connected to the private road. However, if only one end is connected to a public road, the other end must be connected to a public facility or to a road where the public road is scheduled to be transferred.

Grant rate90% (50% for underground legislation such as earth retaining, which is constructed by the area, is limited to 3 million yen)100% (Yokohama City will carry out construction)
WindowPublic Works OfficePublic Works Office

Inquiries to this page

Totsuka Ward Tozuka Public Works Office

Telephone: 045-881-1621

Telephone: 045-881-1621

Fax: 045-862-3501

Email address: to-doboku@city.yokohama.lg.jp