Menu of ward

Close

Here's the text.

About self-financing construction of Nishi-Public Works Office Road

Last Updated February 28, 2019

Changing road structures requires the approval of the Public Works Office (Road Manager) as self-financing work (Article 24 of the Road Law). In addition, please contact Public Works Office for details.

Examples of self-financing construction applications

  • Construction of sidewalks, L-shaped, and curbs for vehicle entry
  • Relocation or removal of car stops and tree-planting basins for vehicle entry
  • Relocation of curved mirrors, street trees, etc. (telephone poles are permitted by NTT, telephone poles are permitted by Tokyo Electric Power Company)
  • Repair and restoration of damaged pavement
  • Road maintenance associated with development and residential land development
  • In addition, when dealing with road structures

Documents to be submitted

  • Application for approval of road construction, etc.(The second copy and the second copy are approved.)
    <attached documents>
  • Guide map (specify the location with a copy of a house map, etc.)
  • Floor plan (illustrates the construction site and the details of the enforcement to those that show the entire site)
  • Vertical cross-section (sample of structural drawing)
  • Photographs of the current situation
  • Copy of road ledger or copy of boundary survey map such as headrace (available in Public Works Office)
  • Copy of official map and construction estimate (as it is only for reference, it does not need)

Flow of application for road self-financing construction
(Flow of application)


Inquiries to this page

Nishi Ward West Public Works Office

Telephone: 045-242-1313

Telephone: 045-242-1313

Fax: 045-241-7582

Email address: ni-doboku@city.yokohama.lg.jp

Return to the previous page

Page ID: 275-934-290

Menu of ward

  • LINE
  • Twitter
  • Instagram
  • YouTube