Menu of ward

Close

Here's the text.

Regarding roads

Last Updated January 25, 2024

We are carrying out systematic maintenance of roads.

Public Works Office manages public roads, excluding highways and national roads in the ward. In order to ensure safe, smooth and comfortable traffic for users, we maintain and maintain roads related to roads.
If you have any questions about the road, please contact Naka Public Works Office.

Consultation on roads

Oh When there is something wrong with the road
Please contact Naka Public Works Office if you are on public roads except highways and national roads in the city.
 
Oh About street tree
Street trees are pruned about once every two to three years, depending on the type of tree, for the purpose of healthy growth of trees.
If you have any questions about street trees, please contact Naka Public Works Office.
In addition, trees that cross the road from private land cannot be cut in principle in Naka Public Works Office.
 
Oh About weeding
Please contact Naka Public Works Office if you are on public roads except highways and national roads in the city.
In addition, plants that cross the road from private land to roads cannot be cut in principle in Naka Public Works Office.
 
For other consultations, please refer to "Frequently Asked Questions and Answers".

About road self-financing construction (road law Article 24 application)

What is road self-financing construction?

When person except road manager performs construction or maintenance about road, it must receive approval and perform construction.
The cost required for this construction, etc. must be borne by the person who has been approved, so it is called self-financing construction.
The application and consultation desk in Naka Ward is Public Works Office.

Application for main road self-financing construction

・Decrease of sidewalks, gutters, curbs, etc. for vehicle entry
・Relocation or removal of vehicle stoppers and tree-planting basins
・Relocation of curved mirrors, street trees, etc. (Please consult with NTT for telegraph poles and Tokyo Electric Power for telephone poles)
・Decrease for location designated roads
・Repair and restoration of pavement damaged by construction work
・Road maintenance associated with development and residential land development
・In addition, when changing the form of road structures (guardrails, crossing prevention fences, etc.) and road facilities

Procedure for self-financing construction

※If there is no person in charge of self-financing construction due to on-site surveys, etc., you may be asked to come back again, so please make a reservation before visiting.

1.Submission of application
(Reason, please prepare the required documents before applying.)
※The standard processing period is 30 days from the submission of the application form to the issuance of the approval letter, so please consult us as soon as possible.

2.Field survey
(The staff will check the documents and contents and conduct a field survey.)

3.Issuance of Approval
(If the content is judged to be appropriate, a letter of approval will be issued after approval.)

4.Submission of Start Notification

5.Construction work
(Please consider the traffic safety of the surrounding area.)

6.Submission of Completion Notification
(Please attach and submit photos before starting, during construction, and after completion.)

7.Issuance of inspection and acceptance notice
(We will check the site and inspect whether it has been completed properly, and if appropriate, issue a letter of acceptance will be issued after approval.)
※If you have any questions, please contact Public Works Office Road Section.

Download of styles, etc.

For inquiries to this page

Naka Ward Middle Public Works Office

Phone: 045-641-7681

Phone: 045-641-7681

Fax: 045-664-6196

Email address: do-nakaiken@city.yokohama.jp

Return to the previous page

Page ID: 819-281-092

Menu of ward

  • LINE
  • Twitter
  • YouTube