It is the top of this page

Yokohama-shi global warming measure implementation plan (city hall)

Last update date April 17, 2020

With the expiration of plan period of "Yokohama-shi global warming measure implementation plan (city hall)" (March, 2014), we revised plan.
We took measures for greenhouse gas discharge reduction about desk work that Yokohama City Hall performed by legal plan based on law about promotion of global warming measure and business and gathered up this plan.

Plan period

From 2018 (Heisei 30) to 2030

Reduction target

We aim at 7% reduction, 2030 30% reduction by the ratio in 2021 in 2013.

Reduction target of greenhouse gas discharge
The yearThe standard year
(2013)

2021 aim

2030 aim
Discharge916,000 t-CO2857,000 t-CO2640,000 t-CO2
The standard year ratio▲7%▲30%

Approach policy

●Thorough operational measures
●Measures in new construction, repair of public building
●Introduction expansion of renewable energy
●Promotion of greenhouse gas reduction measures in cars
●Promotion of approach utilized characteristic of each main business

Plan downloading

Yokohama-shi global warming measure implementation plan (city hall) (PDF: 2,020KB)
Yokohama-shi global warming measure implementation plan (city hall) summary version (PDF: 173KB)

State of implementation

State of implementation (2018) of Yokohama-shi global warming measure implementation plan (city hall) (PDF: 42KB)

Old plan

Yokohama-shi global warming measure implementation plan (city hall)

We raised with the goal of reducing 2017 on the basis of greenhouse gas discharge of 2012 more than 8.6% (about 77,000 t-CO2) as plan period from 2014 and worked.
Plan and the state of implementation are as follows.
Plan downloading
Yokohama-shi global warming measure implementation plan (city hall) (PDF: 1,749KB)
State of implementation
We list about the results level of each year and main reason of comparison with the standard year and the aim year and the discharge increase and decrease.
2017 (PDF: 475KB)
2016 (PDF: 69KB)
2015 (PDF: 35KB)
2014 (PDF: 260KB)

Yokohama-shi global warming measure implementation plan (desk work business)

We raised with the goal of reducing 2013 on the basis of greenhouse gas discharge of 2009 more than 4.9% as plan period from 2010 and worked.
Plan and the state of implementation are as follows.
Plan downloading
Yokohama-shi global warming measure implementation plan (desk work business) (PDF: 617KB)
State of implementation
We list about the results level and main factor of comparison with the standard year and the aim year and the discharge increase and decrease in each year.
2013 (PDF: 299KB)
2012 (PDF: 302KB)
2011 (PDF: 146KB)
2010 (PDF: 327KB)

Yokohama-shi power saving, energy saving measures basic policy

In Yokohama-shi, we worked on power saving, energy saving based on "Yokohama-shi power saving, energy saving measures basic policy" (June, 2011) that we devised with electric power supply and demand stringency caused by the Great East Japan Earthquake.
※We abolished this policy with revision of "Yokohama-shi global warming measure implementation plan (city hall)" (October, 2018).
Downloading
Yokohama-shi power saving, energy saving measures basic policy (PDF: 181KB)
The approach situation
2017 (PDF: 413KB)
2016 (PDF: 413KB)
2015 (PDF: 87KB)
2014 (PDF: 618KB)
2013 (PDF: 1,121KB)
2012 (PDF: 886KB)
2011 (PDF: 985KB)

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

Environmental Planning Bureau environment Maintenance Division environment energy section

Telephone: 045-671-2681

Telephone: 045-671-2681

Fax: 045-550-3925

E-Mail address [email protected]

Return to the previous page

Page ID: 486-448-900

We come back to the top