- Top menu|Search
Finance BureauPublic facilities, business adjustment section>Excellent construction commendation


Yokohama-shi excellence construction commendation system

Summary

News, update information

We changed name of member of two copies of 2018.5.1 summary separate tables.new
About revision of 2018.3.1 2018 summary and the conduct point (Portable Document Format 312KB) 
 

Conduct result of 2017

2017 Yokohama-shi excellence construction commendation ceremony

 

Person of commendation list for the past 6 years

Commendation list (from 2012 to 2017) (Portable Document Format 482KB)

   


Summary and the conduct point

Yokohama-shi excellence construction commendation summary
  Establishment March 29, 2007
  These days revision May 1, 2018 (Portable Document Format 216KB)new
  ※We are applied by the choice of commendation candidate of 2018


The Yokohama-shi excellence construction commendation summary conduct point
  Establishment June 5, 2013
  These days revision March 1, 2018 (Portable Document Format 107KB)
  ※We are applied by the choice of commendation candidate of 2018


Summary of summary and the conduct point

Division of 1 commendation
(1) It commends contractor who undertook construction for results that are excellent by construction that construction company commendation ... Motoichi placed an order for.
(2) It commends spot proxy/agent which undertook construction for results that are excellent by construction that spot person in charge commendation ... Motoichi placed an order for.

Method of 2 commendation

(1) We perform every engineering works, landscape gardening section, facilities section, building section.
(2) We attach supplementary prize to commendation. (attaching commendation shield now)
(3) Commendation performs one time of degree every year.

Construction that is targeted for 3 commendation examination
 
Contract price at the time of contract original by construction finished among construction that Motoichi placed an order for in last year of the commendation year
It is construction that became targeted for construction results rating more than 5 million yen.

Standard (the choice) of 4 commendation
(1) Construction company commendation intends for contractor who accepted an order of plural construction, the choice by the average of construction results rating point
  We intend for contractor of all construction regardless of (we say "mean results excellence construction company" as follows.) and the number that we accepted an order of,
  We perform by the choice (we say "individual results excellence construction company" as follows.) by construction results rating point every construction.
(2)  The average of construction results rating point assumes "mean results excellence construction company" contractor of 5% of high ranks.
(3)  Construction that is higher construction results rating point in "the individual results excellence construction company" with number of "mean results excellence construction company"
  We choose the same number and assume the contractor. In addition, contractor who repeats, and was chosen matches mean results excellence construction company
  We do not perform the choice that we bring this forward.

Construction company commendation


(4)  Spot person in charge commendation intends for spot proxy/agent of all construction, of 2% high-ranking construction results rating point of every construction
  We assume construction spot proxy/agent in charge of. But construction completion result letter of advice (the Yokohama-shi contract construction inspection acting director
  In summary sixth style), thing that the construction system and the construction situation do not reach constant standard is excluded.
   
Spot person in charge commendation       Evaluation according to item


Choice division

The handling of 5 joint ventures

(1) In the choice of mean results excellence construction company construction results rating point of JV construction of each member
  We handle as results.
(2) In the choice of individual results excellence construction company and the choice of construction company commendation by recommendation, JV construction chooses
  When it is done, we assume all the members person targeted for commendation.
(3) In the choice of spot person in charge commendation and the choice of spot person in charge commendation by recommendation, JV construction was chosen
  Every member who does not choose spot proxy/agent in addition to spot proxy/agent in case one control engineer or
  We assume chief engineer having national qualification person targeted for commendation.

6 disqualification matters

(1) Contractor of construction with less than in 70 points of construction results rating points in either construction for commendation examination and togai
  Spot proxy/agent of construction.
(2) Yokohama-shi nomination stops stop nomination with measures summary by the day before on commendation day of the year concerned from commendation day of last year
  Contractor whom period when we received measures (we say "nomination stop" as follows.) of this hangs over. But nomination stop by reason slight
  Contractor who takes the starting date in the case of (thing establishing Yokohama-shi nomination stops in measures summary Article 9 Clause 1).
(3) We judged that it was inappropriate that screening committee which established in Article 8 commended.





Adobe®Reader® is necessary to look at document of Portable Document Format. When Adobe Reader is not installed in PC of the use, you download Adober Reader (free) from the following linked page, and you install, and please use.

We obtain Adobe ReaderTo Adobe Reader download page

※Adobe and Reader are registered trademark in the United States of Adobe Systems incorporated (Adobe Systems Incorporated) and other countries or trademarks.