- Top menu|Search

The Yokohama-shi top > Housing and Architecture Bureau >  Residential land Credit Division

City of Yokohama, Housing and Architecture Bureau menu

 


Residential land Credit Division (residential land Credit Section, adjustment area section)


In residential land Credit Division takuzokyoka based on the regulation method such as procedure based on bylaw about adjustment of Yokohama-shi development projects, development permission, housing land development based on the Town Planning and Zoning Act,
Other than road position designation based on Building Standard Act, we perform planning permission in controlled urbanization zone, building certification of public establishment (only as for the retaining wall).




What's New

H29 .4.1 [development permission] It is NEW! about some revision of guide of development permission based on the Town Planning and Zoning Act

H29 .4.1 [takuzo] It is NEW! about some revision of guide of residential land development

H29 .4.1 [the regulations] It is NEW! about some revision of guide of the regulations about Yokohama-shi development projects

H29 .4.1 [standard revision] It is NEW! about opinion open call for participants result about part revision of standard of development permission based on the Town Planning and Zoning Act, standard about drainage facilities based on the regulation method such as residential land development and the regulations about adjustment of Yokohama-shi development projects and standard revision

H29 .2.20 [common knowledge] About some corrections of structure check of steel reinforced concrete construction retaining wall

H28 .12.12 [opinion open call for participants] About opinion open call for participants about revision of bylaw about adjustment of standard of development permission based on the Town Planning and Zoning Act, standards about drainage facilities based on the regulation method such as housing land development and Yokohama-shi development projects (opinion open call for participants was finished) 

In H28 .8.9 [development permission] road standards, we made link of "standard of public facilities manager".


H28 .7.5 [reinforcement of cliff measures mainly on existing retaining wall] We made "story of retaining wall"



 

Each procedure


The regulations about adjustment of Yokohama-shi development projects


Development permission (area designated for urbanization, controlled urbanization zone)


Development activity, building act in controlled urbanization zone


Permission (area designated for urbanization, controlled urbanization zone) about residential land development


Road position designation


Building certification of public establishment (retaining wall) and inspection


Pickup (system examination)


Related link


About inquiry, consultation  ※Phone number changed for H29 four a year one day a month.

 

  The regulations about adjustment of Yokohama-shi development projects


[important] About duty of development company based on the development projects adjustment regulations


■ The new regulations (after regulations revision of the H25 seven a year one day a month enforcement)


About some revisions of the regulations about adjustment of Yokohama-shi development projects


Summary of the development projects adjustment regulations


□ Guide (H29 four a year one day a month revision) of the regulations about adjustment of Yokohama-shi development projects

Downloading (application, report style, mention example) of format (H29 four a year one day a month some revision)


Flow of procedure


Section teller of the development projects adjustment regulations concerned


Q&A (the new regulations) of the regulations about adjustment of Yokohama-shi development projects


Standard, the handling revision record

 


 

■ The old regulations (one where design book before regulations revision was submitted to by H25 seven a year one day a month)


Guide (the old regulations) of the regulations about adjustment of Yokohama-shi development projects


Downloading (the old regulations) of format


Q&A (the old regulations) of the regulations about adjustment of Yokohama-shi development projects


▲To the top

 

  Development permission (area designated for urbanization, controlled urbanization zone)


Summary (the Town Planning and Zoning Act) of development permission system


□ Guide (H29 four a year one day a month revision) of development permission by the Town Planning and Zoning Act

Downloading (application, report style, mention example) of format (H29 four a year one day a month some revision)


Flow of procedure


Q&A of development permission


Section teller of development permission concerned


Standard, the handling revision record

 



About limit of development activity in green slope (scenery plan)

About basement apartment bylaw (building Planning Division)

General adjustment (Yokohama-shi development adjustment meeting) to affect use of land


Prior report system (Planning Division) of land transaction in industrial accumulation area


▲To the top

 

  Development activity, building act in controlled urbanization zone


In controlled urbanization zone accounting for approximately a quarter of city limits of Yokohama-shi, development activity in the area concerned and building act are regulated by the Town Planning and Zoning Act, and permission of the mayor is necessary.


Permission procedure, permission standard (H29 four a year one day a month revision) in controlled urbanization zone


※ As for the details of standard, please see "guide of development permission by the Town Planning and Zoning Act" - location standard ...


※ Revisions (H29 four a year one day a month revision) such as location standards of controlled urbanization zone

□ Building consultation book <Excel format / Portable Document Format


□ Suggestion standard fourth (branch family house) prior consultation book <Excel format / Portable Document Format


□ Report <Word form about building to offer for one of business of the residence of person running agriculture or agriculture / Portable Document Format


□ At the time of investigation into taxation classification of land and category at the time of controlled urbanization zone designation, identity verification such as being the existing landowner is necessary.


・Guidance sentence <Portable Document Format


・Consultation vote <Word form / Portable Document Format

 


 

About development examination committee, secretary society


□ Bill explanation document <Word form


□ Information for development examination committee, secretary society <Portable Document Format

 


 

About form restrictions of building of controlled urbanization zone


□ When we build building in controlled urbanization zone, there is limit about form of building based on Building Standard Act. (from April 1, 2004)


Form restrictions of building of controlled urbanization zone (building Planning Division)




■ Request


On consultation, take documents such as guide map, copying of public sectional map, entry certificate of land, building.



▲To the top

 

  Permission (area designated for urbanization, controlled urbanization zone) about residential land development


Summaries of the regulation method such as residential land development


Residential land development construction regulation area / Creation residential land disaster prevention area (there is not designation area in Yokohama-shi)


□ Guide (H29 four a year one day a month revision) of residential land development


Downloading (application, report style, mention example) of format 


Flow of procedure


Q&A of residential land development 


Including question common about retaining wall (product for citizens)


Section tellers of the regulation method such as residential land development concerned


Standard, the handling revision record


▲To the top

 

  Road position designation


[important] Road position designation needs procedure of "the regulations about adjustment of Yokohama-shi development projects" from July 1, 2013.


□ Bookmark (H25 four a year one day a month some revision) of Yokohama-shi road position designation application


Downloading (report style, mention example) of format


Road position designated Q&A


■ In addition, books which are necessary for application


Book necessary for request for prejudging prejudging


Book necessary for road position designation application (this application)


■ About fees such as road position designation application


・Road position designation application fee       ・..50,000 yen


・Road position designated change or abolition application fee ...30,000 yen



▲To the top

 

  Building certification of public establishment (retaining wall) and inspection


■ Summary of confirmation application of public establishment (retaining wall)


Application documents of public establishment application (retaining wall) / Instructions after comfirmed securities transaction profit


Downloading (application, report style, mention example) of format


▲To the top

 

  Pickup (system examination)


List of opinion open call for participants items


Standard, handling revision history

Reinforcement of cliff measures mainly on existing retaining wall

Controlled urbanization zone way examination


Situation investigation into large-scale laying earth on the ground land developed for housing


Preventive measures against disasters Exploratory Committees such as creation residential land


▲To the top

 

  Related link


Established regulation inspection of relationships


Administrative map information (i- muppie)


As for restricted zone, the limit by city planning Building Standard Act road classification, local town development plan


Building leadership Building Guidance Division


Duties of building certification (consultation, please be reserved over telephone beforehand)


Housing and Architecture Bureau architecture Disaster Prevention Section (about cliff disaster prevention)


▲To the top

 

  About inquiry, consultation


■ We would like inquiry or consultation as possible in the morning.


・ The staff may become absent by spot inspection in the afternoon.


■ In residential land Credit Section, adjustment area section, we distribute charge according to the area.


・ I would like notification in confirming charge ward on inquiry over telephone well.


・ It is from 13:00 to 17:15 for from 8:45 to 12:00 on weekdays


Phone number of  residential land Credit Section (area designated for urbanization)
 Northern area charge (green, green leaves, Tsuzuki)  045-671-4515
 Western area charge (the south, Hodogaya, Asahi, Seya, spring)  045-671-4516
 Southern area charge (Konan, Isogo, Kanazawa, Totsuka, Sakae)  045-671-4517
 Eastern area charge (in Tsurumi, Kanagawa, the west Kohoku)  045-671-4518
 Planning staff  045-671-2946

 

 Phone number of adjustment area section (controlled urbanization zone)
 Totsuka, Sakae, Konan, Kanazawa, Isogo, the south, spring, Seya, green  045-671-4521
 Green leaves, Asahi, Hodogaya, Tsuzuki, Kohoku, Kanagawa, Tsurumi  045-671-4522



■ The location


〒231-0012 3-56-1, Aioicho, Naka-ku, Yokohama-shi JN building the sixth floor

 

▲To the top